REKAPITULASI PEMBANGUNAN PLATFON
GEREJA HKBP PETUARAN, 31 / 08 / 2020 – 10 / 09 /
2020
I. SUMBER DANA
|
NO |
PEMASUKAN |
JUMLAH
|
KETERANGAN |
|
1. |
Pesta Ulang Tahun Ke-62 HKBP Petuaran |
Rp.
22.372.000 |
26 / 07 /
2020 |
|
2. |
Pesta Gotilon HKBP Petuaran |
Rp.
7.340.000 |
09 / 08 /
2020 |
|
3. |
Eme Pesta Gotilon HKBP Petuaran |
- |
774 Kg |
|
TOTAL |
Rp.
29.712.000 |
- |
|
II. PENGAMBILAN UANG DARI BENDAHARA
|
NO |
ITEM |
JUMLAH
|
KETERANGAN |
|
1. |
Pengambilan Pertama |
Rp.
10.745.000 |
31 / 08 /
2020 |
|
2. |
Pengambilan Kedua |
Rp.
5.000.000 |
03 / 09 /
2020 |
|
3. |
Pengambilan Ketiga |
Rp.
2.500.000 |
05 / 09 /
2020 |
|
4. |
Pengambilan Keempat |
Rp.
6.372.000 |
08 / 09 /
2020 |
|
5. |
Pengambilan Kelima |
Rp.
1.685.000 |
12 / 09 /
2020 |
|
TOTAL |
Rp.
26.302.000 |
- |
|
III. PENGELUARAN
|
TOKO HOSANNA
KERAMIK – Tanjung Morawa – 21 / 08 / 2020 – NOTA |
||||||||||
|
NO |
ITEM |
HARGA |
SATUAN |
TOTAL |
||||||
|
1. |
PVC Murai AS 830 (8mm) |
Rp. 32.000 |
110 Lembar |
Rp. 3.520.000 |
||||||
|
2. |
PVC Murai As 836 (8mm) |
Rp. 32.000 |
115 Lembar |
Rp. 3.660.000 |
||||||
|
3. |
Furing Kobe 0,40mm |
Rp. 15.000 |
150 Lembar |
Rp. 2.250.000 |
||||||
|
4. |
PVC Siku Luar (Putih – P 4m) |
Rp. 21.000 |
13 Lembar |
Rp. 273.000 |
||||||
|
5. |
List PVC Murai (Coklat – P 4m) |
Rp. 23.000 |
14 Lembar |
Rp. 322.000 |
||||||
|
6. |
List PVC Murai (Putih – P 4m) |
Rp. 21.000 |
2 Lembar |
Rp. 42.000 |
||||||
|
7. |
Sekrup Cypsum (1 Inchi) |
Rp. 75.000 |
5 Kotak |
Rp. 375.000 |
||||||
|
8. |
Paku Beton (1 Inchi) |
Rp. 21.000 |
3 Kotak |
Rp. 63.000 |
||||||
|
9. |
Bak Air Kecil |
Rp. 220.000 |
1 Buah |
Rp. 220.000 |
||||||
|
TOTAL |
Rp.
10.745.000 |
|||||||||
|
10. |
Transportasi (Bensin) |
Rp. 150.000 |
Pertalite |
Rp. 150.000 |
||||||
|
|
||||||||||
|
TOKO
HANNOCHS – Perbaungan – 01 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Lampu Hannochs (12W-Down Light) |
Rp. 60.000 |
7 Buah |
Rp. 420.000 |
||||||
|
2. |
Elbo |
Rp. 500 |
20 Buah |
Rp. 10.000 |
||||||
|
3. |
T Dus (Sekrup) |
Rp. 1.200 |
25 |
Rp. 30.000 |
||||||
|
4. |
Kabel Aspan 4 MM |
Rp. 10.000 |
0,75 M |
Rp. 10.000 |
||||||
|
5. |
Paku Klaim (ikk) |
Rp. 40.000 |
1 Bungkus |
Rp. 40.000 |
||||||
|
6. |
Sela Sitgrip |
Rp. 10.000 |
1 Buah |
Rp. 10.000 |
||||||
|
TOTAL
|
Rp. 520.000 |
|||||||||
|
|
||||||||||
|
TOKO HOSANNA
KERAMIK – Tanjung Morawa – 01 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Kabel NYA 2,5 Tembaga |
Rp. 4.000 |
200 M |
Rp. 800.000 |
||||||
|
2. |
Lampu Hannochs (12W-Down Light) |
Rp. 99.000 |
7 Buah |
Rp. 693.000 |
||||||
|
3. |
Steker 2 Lubang Panasonic WNJ6802 |
Rp. 11.000 |
7 Buah |
Rp. 77.000 |
||||||
|
4. |
Steker 1 Lubang Panasonic WNJ6801 |
Rp. 11.000 |
10 Buah |
Rp. 110.000 |
||||||
|
5. |
Steker Indobus
I/B Panasonic WVJ-5911 |
Rp. 6.000 |
17 Buah |
Rp. 102.000 |
||||||
|
6. |
MCB 10A Merlin Gerin DOM 11341 |
Rp. 56.000 |
1 Buah |
Rp. 56.000 |
||||||
|
7. |
Steker Engkel
Panasonic WNJ5001-701 |
Rp. 14.000 |
3 Buah |
Rp. 42.000 |
||||||
|
8. |
Stop Kontak Panasonic WNJ1091-710 |
Rp. 11.500 |
17 Buah |
Rp. 195.000 |
||||||
|
9. |
Pipa Listrik ¾ INOVEN |
Rp. 12.000 |
25 Buah |
Rp. 300.000 |
||||||
|
TOTAL
|
Rp.
2.375.500 |
|||||||||
|
10. |
Transportasi Mobil (Bensin) |
150.000 |
Pertalite |
Rp. 150.000 |
||||||
|
|
||||||||||
|
TOKO
BANGUNAN – Perbaungan – 01 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Tembakan Lem |
Rp. 35.000 |
1 Buah |
Rp. 35.000 |
||||||
|
2. |
Benang Nilon Bangunan |
Rp. 8.000 |
1 Gulung |
Rp. 8.000 |
||||||
|
3. |
Lem Silikon |
Rp. 27.000 |
1 Buah |
Rp. 27.000 |
||||||
|
4. |
Mata Grenda Pemotong Dinding |
Rp. 50.000 |
1 Buah |
Rp. 50.000 |
||||||
|
TOTAL
|
Rp. 120.000 |
|||||||||
|
|
||||||||||
|
TOKO
BANGUNAN – SUKASARI – 03 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Kabel NYA 2,5 Tembaga |
Rp. 320.000 |
100 M |
Rp. 320.000 |
||||||
|
TOTAL
|
Rp. 320.000 |
|||||||||
|
|
||||||||||
|
SUPERMARKET
ELECTRIC GUNUNG SARI – MEDAN – 03 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Soket Lampu Selang IP – 67 (5730) |
Rp. 22.000 |
2 Buah |
Rp. 44.000 |
||||||
|
2. |
Lampu Strip IP - 67 (5730) DOUBLE LED |
Rp. 16.000 |
52 M |
Rp. 832.000 |
||||||
|
TOTAL
|
Rp. 876.000 |
|||||||||
|
|
||||||||||
|
TOKO HORAS
BARU – Lubuk Pakam – 04 / 09 / 2020 – NOTA |
||||||||||
|
1. |
PVC Murai AS 830 (8mm) |
Rp. 35.000 |
25 Buah |
Rp. 875.000 |
||||||
|
2. |
List PVC Murai (Coklat – P 4m) |
Rp. 25.000 |
4 Buah |
Rp. 100.000 |
||||||
|
3. |
PVC Siku Luar (Putih – P 4m) |
Rp. 25.000 |
5 Buah |
Rp. 125.000 |
||||||
|
4. |
List U |
Rp. 25.000 |
38 Buah |
Rp. 950.000 |
||||||
|
5. |
Baut Trus 2 Inchi |
Rp. 500 |
15 Buah |
Rp. 7.500 |
||||||
|
6. |
Furing Kobe 0,40mm |
Rp. 12.000 |
10 Batang |
Rp. 120.000 |
||||||
|
TOTAL
|
Rp.
2.177.500 |
|||||||||
|
7. |
Transportasi Mobil (Bensin) |
Rp. 150.000 |
Pertalite |
Rp. 150.000 |
||||||
|
8. |
Saldo E-Toll |
Rp. 50.000 |
- |
Rp. 50.000 |
||||||
|
|
||||||||||
|
UPAH TUKANG
PLATFON & SEWA PRANCA – 05 / 09 / 2020 – NOTA GEREJA |
||||||||||
|
1. |
Upah Tukang |
Rp. 45.000 |
141,6 M |
Rp. 6.372.000 |
||||||
|
2. |
Pembayaran Pertama |
05
/ 09 / 2020 |
Rp. 3.000.000 |
|||||||
|
3. |
Pelunasan Pembayaran |
08
/ 09 / 2020 |
Rp. 3.372.000 |
|||||||
|
4. |
Sewa Pranca (4 Pranca) |
Rp. 40.000 |
9
Hari Kerja |
Rp. 320.000 |
||||||
|
TOTAL
|
Rp. 6.692.000 |
|||||||||
|
|
||||||||||
|
TOKO
BANGUNAN EDI – Sukasari – 05 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Sudut W PVC |
Rp. 30.000 |
5 Buah |
Rp. 150.000 |
||||||
|
2. |
Mata Gergaji Besi |
Rp. 15.000 |
1 Buah |
Rp. 15.000 |
||||||
|
TOTAL
|
Rp. 165.000 |
|||||||||
|
|
||||||||||
|
TOKO
PANGLONG UD. SINAR JAYA – Pegajahan – 05 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Lem Silikon (Putih Susu) |
Rp. 27.000 |
2 Buah |
Rp. 54.000 |
||||||
|
TOTAL
|
Rp. 54.000 |
|||||||||
|
|
||||||||||
|
TOKO SEJATI
ELEKTRONIK – Perbaungan – 07 / 09 / 2020 – NOTA |
||||||||||
|
1. |
MCB C6 Amper |
Rp. 60.000 |
1 Buah |
Rp. 60.000 |
||||||
|
TOTAL
|
Rp. 60.000 |
|||||||||
|
|
||||||||||
|
TOKO UD.
DEWA JAYA – Pegajahan – 07 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Pipa Listrik |
Rp. 5.000 |
2 Buah |
Rp. 10.000 |
||||||
|
TOTAL
|
Rp. 10.000 |
|||||||||
|
|
||||||||||
|
TOKO UD.
SINAR JAYA – Pegajahan – 08 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Lem Silikon (Putih Susu) |
Rp. 27.000 |
1 Buah |
Rp. 27.000 |
||||||
|
2. |
Tepung Gibsun |
Rp. 5.000 |
10 Kg |
Rp. 50.000 |
||||||
|
Rp.
77.000 |
Rp. 77.000 |
|||||||||
|
|
||||||||||
|
TOKO ANGEL –
Petuaran – 31 / 08 / 2020 – 08 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Air Minum Galon (Tukang) |
Rp. 5.000 |
3 Galon |
Rp. 15.000 |
||||||
|
2. |
Aqua Gelas (Tukang) |
Rp. 15.000 |
1 Box |
Rp. 15.000 |
||||||
|
TOTAL |
Rp. 30.000 |
|||||||||
|
|
||||||||||
|
TOKO UD.
SINAR JAYA – Pegajahan – 09 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Tepung Gibsun |
Rp. 5.000 |
20 Kg |
Rp. 100.000 |
||||||
|
TOTAL
|
Rp. 100.000 |
|||||||||
|
|
||||||||||
|
TOKO UD.
DEWA JAYA – Pegajahan 09 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Scrap Plastik Besar |
Rp. 10.000 |
1 Buah |
Rp. 10.000 |
||||||
|
2. |
Scrap Plastik Kecil |
Rp. 5.000 |
1 Buah |
Rp. 5.000 |
||||||
|
TOTAL
|
Rp. 15.000 |
|||||||||
|
|
||||||||||
|
TOKO ANGEL –
Petuaran – 11 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Aqua Gelas (Gotong Royong) |
Rp. 15.000 |
1 Box |
Rp. 15.000. |
||||||
|
TOTAL
|
Rp. 15.000 |
|||||||||
|
|
||||||||||
|
JASA
INSTALASI LISTRIK HKBP PETUARAN – 11 / 09 / 2020 – NOTA |
||||||||||
|
1. |
Jasa Instalasi Listrik (A.Lubis GPP) |
|
35 Titik |
Rp. 1.200.000 |
||||||
|
TOTAL
|
Rp.
1.200.000 |
|||||||||
|
|
||||||||||
|
SNACK TUKANG
– NOTA |
||||||||||
|
1. |
Snack & Kopi Tukang |
Rp. 25.000 |
10 Hari |
Rp. 250.000 |
||||||
|
TOTAL
|
Rp. 250.000 |
|||||||||
|
|
||||||||||
|
TOTAL
PENGELUARAN KESELURUHAN |
Rp. 26.302.000 |
|||||||||
KETERANGAN
-
Uang Masuk Rp.
29.712.000
-
Uang keluar Rp.
26.302.000
-
Saldo Pesta HUT
& Gotilon Rp. 3.410.000 & Eme 774 Kg.
HKBP Petuaran, 12 September 2020
Diketahui, Uluan Huria, KetuaPembangunan,
Bendahara Huria.

Komentar
Posting Komentar